Laserfiche WebLink
Project 113-13, Work Plan Page b <br /> FIGURES: <br /> 1 Vicinity Map <br /> 2 Site Plan Map with Locations of Proposed Soil Borings <br /> ATTACHMENTS: <br /> 1 The Parker standard operating procedures for drilling soil borings and obtaining <br /> soil samples <br /> 2. The Parker standard operating procedures for collecting organic vapor data <br /> 3 The Parker standard operating procedures for well installation and development <br /> 4 The Parker standard operating procedures for groundwater purging and <br /> sampling <br /> 5 Site Safety Plan <br /> Parker Environmental Services, 4185 Rialto Court, Pittsburg, CA 94565-6116 <br /> Phone (510) 439-1024 Fax (510) 439-2566 <br />