Laserfiche WebLink
d' <br /> 1 <br /> Standard Operating Procedures <br /> GROUNDWATER MONITOR / EXTRACTION WELL INSTALLATION <br /> AND DEVELOPMENT <br /> WELL INSTALL,XTION <br /> Tice boreholes for monitor/extraction wells are drilled using a truck-mounted hollow-stem <br /> auger drill rig:. The diameter of the borehole is a minimum of four inches larger than the <br /> outside diameter of the casing when installing the well screen(DWR Publication 74-91). <br /> The hollow-stem auger provides minimal interuption of drilling while permitting soil <br /> sampling at the desired intervals. All wells are installed by state-licensed drillers. <br /> The monitor/extraction wells are cased with threaded,factory-slotted,blank schedule 40 <br /> polyvinyl chhloride(PVC). The perforated interval consists of slotted casing,generally <br /> 0.020-i.ncti wide by 1.5-inch long slot size,with 42 slots per foot. A threaded PVC cap is <br /> fastened to the bottom of the casing. Centering devices may be fastened to the casing to <br /> assure even distribution of filter material and grout within the borehole annulus. The well <br /> casing is thoroughly washed and steam-cleaned prior to installation. <br /> After setting the casing inside the hollow stem,sand or gravel filter material is poured into <br /> the annular space to fill from the bottom of the boring to I foot above the slotted interval. A <br /> 1 to 2 foot thick bentonite plug is placed above the filter material to prevent the grout from <br /> infiltrating down into the filter material. Neat cement,containing about 5%bentonite,is then <br /> tremied into the annular space from the top of the bentonite plug to the surface. A lockable <br /> PVC cap is placed on each wellhead. Traffic-rated flush-mounted steel covers are instilled <br /> around wellheads for were in parking lots and driveways,while steel stove pipes are usually <br /> set over wellheads in lanc,scaped areas. <br /> WELL DEVELOPMENT <br /> After installation,the wells are thoroughly developed to remove residual drilling materials <br /> from the wellbore,and to improve well performance by removing any fine material in the <br /> filterpack that can pass from the formation into the well. Well development is performed ir. <br /> accordance with Califomia Regional Water Quality Control Board(RWQCB)procedures <br /> described in the Leaking Undergrourd Fuel Tank(LUFT)Field Manaul,the Tri-Regional <br /> Board Staff Recommendations for Preliminary Evahiation and Investigation of Underground <br /> Tank Sites,and local regulatory guidelines.Well development techniques include pumping, <br /> bailing,surging,swabbing,jetting,flushing,and airlifting. During well development from <br /> three to ten well volumes are evacuated from the well,allowing pH,specific conductivity, <br /> temperature and sediment content of the water to stabilize. All development water and <br /> rinseate is collected for temporary storage in labeled 55-gallon containers or proper storage <br /> tanks,and is then disposed of properly depending on analytical results. To assure that <br /> cross-contamination does not occur between wells during drilling and development,all <br /> development equipment is either steam cleaned or cleaned using Alconox and rinsed twice <br /> with dionized water. <br /> Parker Environmental Services, 4185 Rialto Court, Pittsburg, CA 94565-6116 <br /> Phone (415) 439-1024 Fax (415) 439-2566 <br />