Laserfiche WebLink
reinjecting the water into the aquifer through three wells located around the <br /> perimeter of the contaminated groundwater plume. <br /> Samples will be collected from the inlet and outlet of the mixing tank during the <br /> i <br /> cleanup to confirm that the bioremediation is working. Several other wells located <br /> onsite will also be monitored during the cleanup. The system is expected to require <br /> two to four weeks to cleanup the contaminated groundwater. Following the cleanup, <br /> samples will be collected on a quarterly basis to verify the success of the <br /> bioremediation. <br /> i <br /> 95R2 East Bay Municipal Utility District <br /> 40429601\execsum.rem 11 Stockton Service Center-Remediation <br /> i <br />