Laserfiche WebLink
V <br /> • Work to stop during thunderstorms or electrical storms. <br /> • No facial hair-that would interfere with respirator fit. <br /> C <br /> • Continuous breathing zone air monitoring to occur while site <br /> ` activities are in progress. <br /> • The drilling rig will not be located where the mast may come <br /> Lwithin 10 feet of overhead power lines or at a distance deemed <br /> unsafe by the utility owner. The utility company will be contacted <br /> to determine the proper,distance if within 75 feet of a utility line. <br /> L <br /> H. Decontamination Procedures <br /> �. For Personnel: <br /> • Scrub boots with Alconox and .water solution and rinse with water. <br /> • Remove outer gloves. <br /> • Remove coveralls. <br /> If respirator is worn: <br /> • Wash inner gloves. <br /> • Remove respirator. <br /> • Remove inner gloves. <br /> r_ • Shower and change clothes as soon as possible. <br /> L _ <br /> For Equipment: <br /> • Steam clean drilling equipment using Level C PPE. <br /> L • Wash sampling equipment with an Alconox and water solution. <br /> P g <br /> • Rinse sampling equipment twice with deionized "water. <br /> • Monitoring equipment will be wiped with an Alconox" and water <br /> solution and wiped dry. <br /> 93822 East Bay Municipal Utility District <br /> 40429200.wp 32 Work Plan-Stockton Service Center <br /> 1rr <br /> f <br />