My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0004278
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1804
>
3500 - Local Oversight Program
>
PR0545493
>
ARCHIVED REPORTS_XR0004278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 6:45:38 AM
Creation date
3/11/2020 8:37:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004278
RECORD_ID
PR0545493
PE
3528
FACILITY_ID
FA0009460
FACILITY_NAME
Stockton Center - EBMUD
STREET_NUMBER
1804
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
14505027
CURRENT_STATUS
02
SITE_LOCATION
1804 W MAIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r r r r r r r r r r r r r irr <br /> Table 7 <br /> Evaluation of Remedial Alternatives <br /> Stockton Service Center <br /> Alternative rmplementability TelcbniW Feasibility -co <br /> 1 Extraction/Air Implementable at the site,but would Effectively addresses the $50,000 to 5250,000 <br /> Stripping/Discharge require an area for the air stripper contaminants of concern May <br /> and piping. Existing wells can be require off-gas treatment Disposal <br /> converted to extraction and option would depend on regulatory <br /> reinjection wells Aquifer tests are approval and water quality <br /> required to determine well placement requirements. Proven technology <br /> and pump sizing, <br /> 2 Air SparginglVapor Requires establishing a vapor Effective in addressing contaminants, 5100,000 to 5500,000 <br /> I <br /> Extraction extraction system and associated but if formation is too tight,effective <br /> piping in addition to an air injection removal might be difficult <br /> well Pilot study required to <br /> determine whether effective air <br /> movement can be achieved <br /> 3 In Situ Btoremediatton $75,000 to$300,000 <br /> Active Implementable at site Would only Effectively addresses the <br /> require monitoring,microbial and contaminants of concern Platelet <br /> nutruient mput to groundwater,and and nutrient studies would be <br /> Input of oxygen Existing wells could required Regulatory approval would <br /> be used for injection of materials and be required Pilot testing may be <br /> for monitoring_ required <br /> Passive fmplementable at site Monitoring Effectiveness will depend on the 550,000 to $200,000 <br /> would be required presence of sufficient microbes <br /> Platelet and nutrient studies would be <br /> required Passive bioremediation <br /> would involve an extended <br /> remediation duration and extended <br /> monitorin& <br /> Ranges of costs are approximate and are based on estimalea volumes an uration o reme cation <br /> 93R22East Bay Municipal Utility District <br /> Stockton Svc Ctr -Site AssessmenURemedial Options <br /> 40429500 ase <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.