Laserfiche WebLink
Mat <br /> i< <br /> Samples were sealed into ziplock plastic baggies and placed with ice in an Insulate <br /> chest for delivery with a chain-of-custody document tothe WESTON Analytics'laboratory <br /> in Stockton, California. This laboratory is certified by the State of California to perform <br /> the raquired analyses. All of the soil samples EPA Method $01 itted or analysis <br /> of toluene, <br /> Petroleum Hydrocarbons as Gasoline (TPH-G) by <br /> ethylbenzene and xylene(BTEX)by EPA Method 8020 and for total lead by EPA Method <br /> 7421. A summary of samples collected is presented in Table A-1. <br /> I BLS l�-'l�A <br /> Borehole Sample Summary <br /> Sod Sample No. <br /> Sample Depth Chemical Analysis <br /> i feet SGS <br /> MW-4-10 <br /> W 4 10 .10 EPA Method 8015 TPH-G <br /> EPA Method 8020 BTEX <br /> EPA Method 7421 Total Lead <br /> MW-5 10 10 EPA Method 8015 TPH-G <br /> EPA Method 8020 BTEX <br /> EPA Method 7421 Total Lead <br /> MW-6-10 10 EPA Method 8015 TPH-G <br /> EPA Method 8020 BTEX <br /> EPA Method 7421 1"otal Lead <br /> MW-7-10 10 EPA Method 8015 TPH-G <br /> EPA Method 8020 BTEX <br /> EPA Method 7421 Total Lead <br /> All devices used to drill the borings and collect soil samples (including augers, <br /> bits, split <br /> spoon,stainless steel knife,etc.)were decontaminated prior to first use and between uses <br /> for each sample. Auger flights and bits were decontaminated by steam cleaning,whereas <br /> all smaller tools were washed in an aiconox/water mixture with stiff bristle brushes, rinsed <br /> in potable water and finally spray-rinsed with distilled water. All water that had been used <br /> for brought <br /> to thn dui ng`t9hedrilling was also placed into labeled into labeled 55-gallon drums. All c55kgallon steengs and d <br /> brought to the surface <br /> drums. All drums were left on-site. <br /> Monitoring wells were installed in all borings. The monitoring wells installed (MW-4, <br /> MW-5, MW-6 and MW-7) utilized two inch diameter schedule 40 PVC casings. Flsre <br /> a <br /> feet of screened section was placed In each well. Monitoring well construction details are <br /> presented in Table A-2. <br /> A - 2 <br /> =y <br />