Laserfiche WebLink
L € <br /> w <br /> s 7 <br /> �_. <br /> ed by a combination of pumping and bailing. The <br /> Each of the four wells was develop t feast 5g gallons each and balled <br /> . ed repeatedly to l'berate as much lane from the borehole walls as <br /> wells were bail by pumping <br /> possible. The wells were then purged sediment. All purge water was container- <br /> Atthe end of the development process, dtm water derived from all wens was ace <br /> Container- <br /> again. ht to the surf <br /> slightly turbid and relatively free of suspended <br /> ized, labeled, and left at the site pending labelysis. Alllsoil <br /> cuttings <br /> site. <br /> oug <br /> during drilling were also contains <br /> was performed in accord with WESTON`s site specific health and safety <br /> All on-site work was performed under level D personnel protection <br /> plan. The geld work for this project Were encountered. <br /> Air monitoring <br /> for volatiles was performed utilizing an HNu photoionization detector(PID <br /> ' No sustained levels of volatiles above background <br /> A-4 <br />