My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012340
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012340
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 1:37:32 AM
Creation date
3/11/2020 11:16:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012340
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"r } <br /> i <br /> r <br /> ERI 205513 QS7 Tosco 76 Service Station 5886 Stockton California January 29 1999 <br /> adjacent to catch basins, drilling four soil borings, and constructing dual completion groundwater <br /> monitoring wells (MW4S/D through MW7S/D) at discreet depths in these borings Work also included <br /> associated well development and sampling, and analyses of soil and groundwater samples The data <br /> obtained during the investigation indicated the following <br /> Residual hydrocarbons were not detected at or above the stated laboratory method detection <br /> limits in soil samples collected from adjacent to three on-site catch basins located near the <br /> pump islands (see Plate 2) except for maximum concentrations of 3 3 parts per million (ppm) <br /> total purgeable petroleum hydrocarbons as gasoline (TPPHg), 8 4 ppm total extractable <br /> petroleum hydrocarbons as diesel (TEPHd), and 12 ppm MTBE <br /> Residual hydrocarbons in soil appear to have been delineated beneath the site <br /> Groundwater was encountered at approximately 9 to 14 ft bgs During May 1997, static <br /> groundwater elevations in the groundwater monitoring wells ranged from approximately 6 to <br /> 9 5 ft bgs and the groundwater gradient was towards the southwest at a calculated hydraulic <br /> gradient of 0 002 Groundwater elevations were essentially the same in the shallow and deep <br /> wells, indicating hydraulic communication between the two depths <br /> The lateral and vertical extent of TPPHg and benzene, toluene, ethylbenzene, and xylene <br /> (BTEX) appear to have been delineated beneath the site Concentrations of MTBE were <br /> delineated in each direction except towards the south and southwest based on the initial <br /> sampling of wells MW4S/D through MW7S/D <br /> Based on the results of the investigation, ERI submitted a Work Plan which included 1) obtaining and <br /> reviewing available MTBE data from previous investigations, 2) performing two additional <br /> groundwater monitoring and sampling events and interpreting the data to further evaluate the extent of <br /> dissolved MTBE in groundwater and select additional well locations (if necessary), 3) drilling three soil <br /> borings adjacent to former catch basins, 4) obtaining appropriate permit(s) and access agreement(s), <br /> drilling off-site soil boring(s), collecting soil samples, constructing groundwater monitoring well(s), <br /> developing and purging the new well(s), collecting groundwater samples, and analyzing selected soil <br /> and groundwater samples, and 5) preparing a report <br /> The County response to the work plan requested Tosco complete the following 1) perform a detailed <br /> site assessment to evaluate the lateral and vertical extent of MTBE in groundwater and whether these <br /> compounds have migrated off-site, and in addition, analyze groundwater samples for the seven <br /> oxygenated compounds identified in the California Regional Water Quality Control Board Central <br /> Valley Region (Regional Board) document dated July 18, 1997, 2) perform a conduit study and well <br /> survey to identify underground facilities that may provide potential preferential groundwater flow and <br /> constituent migration, 3) characterize hydrogeology beneath and in the vicinity of the site, and 4) <br /> identify the source(s) of MTBE detected in groundwater beneath the site and the approximate time <br /> frame of MTBE/additives release and history <br /> At the request of Tosco, ERI submitted the Work Plan addendum (dated August 8, 1997) The <br /> addendum addressed the directive for a full dimensional definition and investigation of soil and <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.