Laserfiche WebLink
ERI 205513 QS6 Tosco 76 Service Station 5886 Stockton California October 30 1998 <br /> `ow groundwater samples collected from monitoring wells MW3 and MW4D, respectively <br /> TEPHd was not detected at or above laboratory method detection limits in these <br /> samples when they were reanalyzed following a silica gel cleanup <br /> • MTBE was not detected above laboratory method detection limits in monitoring wells <br /> MW1, MW5D, MW5S, MW7D, and MW7S MTBE was detected in the remaining <br /> groundwater monitoring wells ranging from 8 0 µglL to 4,500 ug/L using EPA <br /> method 8260 <br /> • Tosco has successfully obtained access agreements from several owners of properties directly <br /> across March Lane (south and southwest) Hmeier, Tosco has been unsuccessful to it's <br /> attempts to obtain an access agreement with the o«ner of the property adjacent to the <br /> western Tosco property boundary to allow off-sitz use of a CPT <br /> The following work is being performed <br /> • Tosco is currently awaiting approval from the County of the proposed CPT locations <br /> • Tosco will continue quarterly groundwater monitoring and sampling at the subject site <br /> • ERI and Tosco will continue to conduct a further comprehensive revie« of the data acquired <br /> during previous work and present Quarterly Reports to the County which describe the status <br /> of the proposed work by the dates established b) (lie County <br /> Additionally, Tosco requests that the County assist in obtaining an access agreement with Thompson <br /> Partners Limited, the property owners of 2727 March Lane (IN-OUT BURGER), Stockton, California <br /> to facilitate implementation of the oft-site CPT investigation The Thompson, Partners Limited office <br /> is located at 1919 Grand Canal Boulevard, #B-5, Stockton CA 95207 <br /> The ongoing work will be completed in accordance with the procedures outlined in ERI's Work Plan <br /> for Supplemental Environmental investigation (dated Jul% 14, 1997) and Addendum to Wort: Plan <br /> (dated August 8, 1997) ERI %ill submit a comprehensiNe Soil and Water Investigation Report within <br /> 45 days following completion of the field work including installation of monitorine X%ells <br /> ERI reconunends signed copies of this summary report be forwarded to the follo«inR <br /> Mr Ronald Rowe, Sr <br /> Site Mitigation Unit <br /> San Joaquin County Public Health Services <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> 4 <br />