My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012354
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 1:30:38 AM
Creation date
3/11/2020 11:21:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012354
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• i <br /> ERI 205513 QS1 Unocal Service Station 5886, Stockton, California August 21 1997 <br /> iERI and Tosca will continue to conduct a further comprehensive review of the data acquired during <br /> previous work and present Quarterly Reports to San Joaquin County PHS/EHD which describe the <br /> status of the proposed work by the dates established by San Joaquin County PHS/EHD <br /> The ongoing work will be completed in accordance with the procedures outlined in ERI's Work Plan <br /> for Supplemental Environmental Investigation (dated July 14, 1997) and Addendum to Work Plan <br /> (dated August 8, 1997) ERI anticipates completing the conduit study and submitting the proposed <br /> locations for the cone penetrometer study during the next quarter ERI will submit a comprehensive <br /> Soil and Water Investigation Report within 45 days following completion of the field work including <br /> installation of monitoring wells <br /> ERI recommends signed copies of this work plan be forwarded to the following <br /> Mr Ronald Rowe, Sr <br /> Site Mitigation Unit <br /> San Joaquin County Public Health Services <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Please call (415) 382-9105 if you have questions regarding this summary report <br /> Sincerely, <br /> Environmental Resolutions, Inc <br /> Pip <br /> GEp�G <br /> QCO RGA Keith A Romstad <br /> g Q Project Manager <br /> �p <br /> �?Z�OF <br /> Steve M Zigan <br /> R G 4333 <br /> H G 133 <br /> Attachments Plate 1 Site Vicinity Map <br /> Plate 2 Generalized Site Plan <br /> T E I UST Testing Systems Summary Sheet <br /> cc Mr Ed Ralston - Tosco <br /> Ms Sherri Kirk - Starsky & Kirk <br /> i 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.