My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012355
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012355
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 2:32:22 AM
Creation date
3/11/2020 11:22:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012355
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FIELD PROTOCOL <br /> ' Site Safety Plan <br /> ' Field work is performed by ERI personnel in accordance with a site safety plan developed for the site <br /> This plan describes the basic safety requirements for the subsurface investigation and the drilling of soil <br /> borings at the work site The site safety plan is applicable to personnel and subcontractors of ERI <br /> Personnel at the site are informed of the contents of the site safety plan before work begins A copy of <br /> the site safety plan is kept at the work site and is available for reference by appropriate parties during <br /> the work The ERI geologist acts as the Site Safety Officer <br /> ' Soil Borings,and Sampling, <br /> i <br /> Prior to drilling of borings and construction of wells, ERI acquires necessary permits from the <br /> ' appropriate agency(ies) ERI also contacts Underground Service Alert (USA) before drilling to help <br /> locate public utility lines at the site ERI observes the driller hand-probe and hand-auger boring <br /> ' locations to a depth of approximately 5 feet bgs and a diameter greater than the soil boring diameter <br /> before drilling to reduce the risk of damaging underground structures <br /> Soil borings are drilled with a CME-55 (or similar) drill rig equipped with 8-inch diameter, hollow- <br /> stem augers Auger flights and sampling equipment are steam-cleaned before use to minimize the <br /> possibility of cross-hole contamination The ansate is containerized and stored on site ERI will <br /> coordinate with Tosco for appropriate recycling or disposal of the rinsate <br /> ' Drilling is performed under the observation of a field geologist, and the earth materials in the borings <br /> are identified using visual and manual methods, and classified as drilling progresses using the Unified <br /> Soil Classification System Soil borings are drilled to discrete depth within the upper water bearing <br /> zone identified during earlier field work and verified during drilling <br /> ' During drilling, soil samples are collected at 5-foot intervals, obvious changes in lithology, and,lust <br /> above the groundwater surface Samples are collected with a California-modified, split-spoon sampler <br /> equipped with laboratory-cleaned brass sleeves Samples are collected by advancing the auger to a <br /> ' point dust above the sampling depth and driving the sampler into the soil The sampler is driven 18 <br /> inches with a standard 140-pound hammer repeatedly dropped 30 inches The number of blows <br /> required to drive the sampler each successive 6-inch interval is counted and recorded to give an <br /> ' indication of soil consistency <br /> Soil samples are monitored with a photoionization detector (PID), which measures hydrocarbon <br /> ' concentrations in the ambient air or headspace above the soil sample Field instruments such as the <br /> PID are useful for indicating relative levels of hydrocarbon vapors, but do not detect concentrations of <br /> hydrocarbons with the same precision as laboratory analyses Soil samples selected for possible <br /> chemical analysis are sealed promptly with Teflon® tape, and plastic caps The samples are labeled and <br /> placed in iced storage for transport to the laboratory Chain of Custody Records are initiated by the <br /> geologist in the field, updated throughout handling of the samples, and sent with the samples to the <br />
The URL can be used to link to this page
Your browser does not support the video tag.