Laserfiche WebLink
Precision Sampling <br /> Project Tosco 76 <br /> Reference level Bank Building Predrilling depth 0 30 m Project number Environmental Resolutions 205503Site 2701 Marsh Lane, Stockton, Calif <br /> Level at ref 0 00 in Predrilled material Concrete&Fill Designation CPT 2 <br /> Ground water level 2 30 m Equipment SD-1 Vibra-Push 12 Ton Rig Date 2119199 <br /> Start depth 0 30 m Geometry Normal <br /> Undrained shear strength TfLj (kPa) Friction angle (a) Relative density Ip N Modulus (MPa) <br /> Classification 0 20 40 60 80 100 120 30 40 50 0 50 100 150 200 0 5 10 15 20 25 30 35 <br /> 00- <br /> vL <br /> 0vL (W) x x•o <br /> 05 s <br /> 1111 x x <br /> L <br /> x x x o <br /> tY <br /> Q � Med <br /> x <br /> x x o <br /> L <br /> 1 5 xSmame <br /> shenVsn <br /> Sa x x * . L nw,aver cansoUdated <br /> Lum-'.n—wly--ohdaw <br /> E vL x x x a <br /> 20 L <br /> o <br /> x x <br /> x x + o <br /> 25 <br /> X♦Q <br /> v L [6 1 <br /> 9 — <br /> L x + <br /> 3 0vL <br /> L x x x <br /> x x + <br /> 36- <br /> x x + <br /> vL <br /> x x x a <br /> X x Ix <br /> CPT2 1999-02-22 <br />