My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012395
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 1:04:50 AM
Creation date
3/11/2020 11:30:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012395
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f � <br /> S IEC ® R <br /> . Based on the results of the second quarter 2004 data (both groundwater monitoring and <br /> remediation system operational data) ozone spargrng continues to be effective in reducing <br /> Petroleum hydrocarbon concentrations Dissolved MTBE and other hydrocarbon levels have <br /> declined over time since remediation system startup in 2002 (1 a as shown in Graph 1, <br /> Attachment A) SECOR recommends that the system continues operation <br /> CHARACTERIZATION STATUS <br /> Contamination in soil and groundwater has been adequately delineated <br /> RECENT SUBMITTALS/CORRESPONDENCE <br /> None <br /> THIS QUARTER ACTIVITIES (Second Quarter 2004) <br /> 1 Performed quarterly groundwater monitoring and sampling (TRC) <br /> 2 Prepared and submitted a quarterly summary report <br /> 3 Performed remedial system O&M <br /> NEXT QUARTER ACTIVITIES (Third Quarter 2004) <br /> 1 Prepare and submit a quarterly summary report <br /> 2 Perform quarterly groundwater monitoring and sampling <br /> 3 Perform remedial system O&M <br /> e <br />
The URL can be used to link to this page
Your browser does not support the video tag.