Laserfiche WebLink
ERI <br /> ENVIRONMENTAL RESOLUTIONS, INC. <br /> 1 <br /> ' CORRECTIVE ACTION PLAN <br /> I for <br /> Tosco 76 Service Station 5886 <br /> 2701 West March Lane <br /> Stockton, California <br /> For Tosca Marketing Company <br /> 1.0 INTRODUCTION <br /> 1 <br /> At the request of Tosco Marketing Company (Tosco), Environmental Resolutions, Inc (ERI) has <br /> ' prepared this corrective action plan (CAP), which presents a summary of site activities conducted to <br /> 'f date, including the results of the feasibility study, and presents an approach for remediating <br /> I groundwater at this site Tosco requested that ERI conduct the feasibility study to evaluate the <br /> effectiveness of air sparge/soil vapor extraction (AS/SVE) at this site <br /> This CAP specifically includes results of data collected during select previous field investigations and <br /> the AS/SVE test <br /> 1_1 Settin <br /> The site is located immediately west of Interstate I-5 on the northwestern corner of West March Lane <br /> and the I-5 offramp in Stockton, California, as shown on the Site Vicinity Map (PIate 1) The location <br /> of the existing underground storage tank (UST) field, dispenser pump islands, other selected site <br /> features, and surrounding properties are shown on the Generalized Site Plan (Plate 2) Properties in <br /> ' the vicinity of the site are generally commercial <br /> 1 73 Digital Drive, Suite 100, Novato, California 94949-5791 415-382-9105 (FAX 415-382-1856) <br /> Lake Forest - Novato - Seattle <br />