Laserfiche WebLink
WELL MONITORING/SAMPLING <br /> FIELD DATA SHEET <br /> Client/ TOS GO <br /> Facilitylt SI-86 Job#: 19613-7 <br /> Address: Z -7�d Lzn-e Date: _ 6 ///q`? -e 6/2/4 _ <br /> City: S � �_ Sampler- <br /> Well ID Mme— /� Well Condition �✓!� <br /> Well Diameter Z in. Hydrocarbon Amount Bailed <br /> Thickness ffeetl (product/water) allons <br /> Total Depth 3 S c7b, ft. Volume 2" = 0 17 3"= 0 38 4" = 0 66 <br /> Depth to Water (./ h. <br /> Factor(VF) 6"= }50 12"= 5 80 <br /> _ 6 <br /> g3 <br /> � X VF � /; _- d � X 3 (case volumes = Estimated Purge Volume f I <br /> Purge Disposable Bailer Sampling - <br /> Equipment Bailer Equipment: Disposable Bailer <br /> Stack Sas er <br /> uctio Pressure Bailer <br /> Grundfos Grab Sample <br /> Other Other <br /> v � <br /> Starting Time IF �& s Weather Conditions _ 6LMS, <br /> Sampling Time 17- --2-f Water Color G Odor <br /> Purcing Flow Rate N qpm Sediment Description <br /> Did well de-water? I'"`' If yes, Time Volume rcai 1 <br /> Time Volume pH Conductivity Temperature D O ORP Al)cahrury <br /> 1-7 (S a' 3 [ um °/Z)UDd (m8R-) (mv) (ppm) <br /> LABORATORY INFORMATION <br /> SAMPLE ID f#}- CONTAINER REFRIG PRESE9V TYPE LABORATORY ANALYSES <br /> (y— /0 D 3 &-9 Y mc-i SEQUOIA TPH(G)/btex/mtbe <br /> rlV_,0D z VOA- oxr <br /> COMMENTS <br /> 9197 Mm"t film <br />