14 (1 <br /> ERI 205513 QSR17 Tosco Service Station 5m, Stockton Califorrua 1u] 23 2001 <br /> • During second quarter 2000, ERT installed one UST cavity well in general accordance with the <br /> CAP (ERI, December 28, 1999) and Tosco initiated periodic purging of groundwater from the UST <br /> cavity well and from groundwater monitoring well MW3 Tosco purged approximately 46,000 <br /> gallons of groundwater during second and third quarters 2000 Groundwater purging was <br /> temporarily discontinued during third quarter 2000 pending clarification from the County regarding <br /> water sampling and data collection requirements Purging was resumed during January 2001 <br /> Currently, there are three on-site, single-casing groundwater monitoring wells (MW1 through MW3), <br /> four on-site, dual-casing groundwater monitoring wells (MW4S/D through MW7SID), one on-site UST <br /> cavity well, and nine off-site groundwater monitoring wells (MW8S/I/D through MW10S/IID) <br /> consisting of three wells at each nested well location as shown on Plate 2. The purpose of these wells <br /> is to evaluate the lateral and vertical extent of dissolved hydrocarbons detected in groundwater beneath <br /> the site <br /> Based upon data collected during ongoing quarterly groundwater monitoring and sampling, dissolved <br /> hydrocarbons are delineated both laterally and vertically in the vicinity of the site However, dissolved <br /> hydrocarbons continue to be detected in groundwater samples from beneath the site and are <br /> concentrated in the vicinity of the UST cavity <br /> SECOND QUARTER ACTIVITIES <br /> Based upon previous work completed at the site, and in accordance with the correspondence and <br /> • request trom the County, the following tasks were performed during the second quarter 2001 <br /> • Approximately 63,000 gallons of MTBE impacted groundwater were purged from beneath the site <br /> and transported to the Tosco refinery for disposal Approximately 156,500 gallons of groundwater <br /> have been purged from beneath the site since IR activities were initiated in June 2000 <br /> • During June 2001, Tracer Research Corporation (TRC) performed an enhanced leak detection test <br /> on underground storage systems to evaluate the system integrity <br /> • Tosco arranged to have surface cracks on the site seated to reduce the possibility of surface <br /> hydrocarbon spills impacting soil <br /> • Gettler-Ryan, Inc (GRI) of Dublin, California collected monthly groundwater samples from on-site <br /> wells MW I through MW4D/MW4S and MW6DIMW6S for MTBE analysis and performed <br /> quarterly groundwater monitoring and sampling at the site on May 7 and 8, 2001 The GRI Second <br /> Quarter 2001 Groundwater Monitoring and Sampling Report is provided as Attachment A The <br /> results of the second quarter monitoring and sampling event indicate the following <br /> • Groundwater was measured at approximately 6 0 to 9 8 feet below ground surface (bgs) in <br /> the groundwater monitoring wells (an elevation variation of approximately 0 1 to 0 4 feet <br /> when compared to the first quarter 2001 groundwater monitoring and sampling event) <br /> During May 2001, groundwater flow direction was towards the southwest with a calculated <br /> hydraulic gradient of approximately 0 002 to 0 006 Historical groundwater flow <br /> directions are shown on the Groundwater Flow Direction Rose Diagram (Plate 3) <br /> 3 <br />