Laserfiche WebLink
ERI 205513 OSR16 Tosco Service Station 5886 Stockton Caltforma Aril 26 2001 <br /> • During second quarter 2000, ERI installed one UST cavity well in general accordance with the <br /> CAP (ERI, December 28, 1999) and Tosco initiated periodic purging of groundwater from the UST <br /> cavity well and from groundwater monitoring well MW3 Tosco purged approximately 46,000 <br /> gallons of groundwater during second and third quarters 2000 Groundwater purging was <br /> temporarily discontinued during third quarter 2000 pending clarification from the County regarding <br /> water sampling and data collection requirements <br /> Currently, there are three on-site, single-casing groundwater monitoring wells (MWI through MW3), <br /> four on-site, dual-casing groundwater monitoring wells (MW4SID through MW7S/D), one on-site UST <br /> cavity well, and nine off-site groundwater monitoring wells (MW8SI1/D through MW10S/1/D) <br /> consisting of three wells at each nested well location as shown on Plate 2 The purpose of these wells <br /> is to evaluate the lateral and vertical extent of dissolved hydrocarbons detected in groundwater beneath <br /> the site <br /> Based upon data collected during ongoing quarterly groundwater monitoring and sampling, dissolved <br /> hydrocarbons are delineated both laterally and vertically in the vicinity of the site However, dissolved <br /> hydrocarbons continue to be detected in groundwater samples from beneath the site and are <br /> concentrated in the vicinity of the UST cavity <br /> FIRST QUARTER ACTIVITIES <br /> Based upon previous work completed at the site, and in accordance with the correspondence and <br /> request from the County, the following tasks were performed during the first quarter 2001 <br /> • During January 2001, Tosco resumed IR activities at the site following clarification of the sampling <br /> and evaluation requirements provided by the County in their December 4, 2000 letter Between <br /> January 24 and February 7, 2001, three groundwater purging events were performed at the site, <br /> during which approximately 15,000 gallons of groundwater were purged from the UST well and <br /> well MW3 The purged water was transported to the Tosco Refinery in Rodeo, California for <br /> disposal During each purging event, groundwater samples were collected from the UST cavity <br /> well and well MW3 both before and after purging, and a water sample was collected from the <br /> purged groundwater Based on the results of laboratory analysis of the groundwater samples, ERI <br /> calculated that approximately 14 pounds of MTBE were removed from groundwater during the <br /> initial January 24 through February 7, 2001 groundwater purging events (ER1, March 28, 2001) <br /> • During first quarter 2001, approximately 47,500 gallons of MTBE impacted groundwater was <br /> purged from beneath the site and transported to the Tosco refinery for disposal Approximately <br /> 93,500 gallons of groundwater have been purged from beneath the site since IR activities were <br /> initiated in June 2000 <br /> • Gettler-Ryan, Inc (GRI) of Dublin, California performed groundwater monitoring and sampling at <br /> the site on February 5 and 6, 2001 The GRI First Quarter 20401 Groundwater Monitoring and <br /> Sampling Report is provided as Attachment A The results of the first quarter monitoring and <br /> sampling event indicate the following <br /> . 3 <br />