My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012427
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
ARCHIVED REPORTS_XR0012427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 11:50:56 PM
Creation date
3/11/2020 11:42:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012427
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 �A <br /> • ERI 205543ER L46 Tosco 7G Service Station 58$6 Stockton California <br /> March 28 2001 <br /> MTBE concentrations in water samples collected from the UST cavity well and well MW3 are shown <br /> on the Concentration vs Time Graph (Graph 1) The laboratory analysis reports and Chain of Custody <br /> records are provided in Attachment B <br /> Selected water samples were also analyzed for the 17 California Assessment Metals (17-CAM metals), <br /> total cyanide, sulfide, reactivity, corrosivity, and ignitability for disposal profiling at the Tosco <br /> Refinery The results of laboratory analysis of these elements/compounds are provided in <br /> Attachment B <br /> Using the results of laboratory analysis for the samples collected from the purged groundwater, ERT <br /> calculated that approximately 14 pounds of MTBE were removed from beneath the subject site during <br /> the three purging events A summary of the amount of MTBE removed is provided in Table 2 The <br /> MTBE removal data are also shown on Graph 2 Due to the elevated detection limits of the remaining <br /> hydrocarbon compounds, ERI did not calculate the total mass removed of these other constituents <br /> ERI recommends continuing weekly purging of the UST cavity well and well MW3 and collecting <br /> monthly water samples from wells MW2 and MW3 for six consecutive months to evaluate the effect of <br /> weekly groundwater purging on concentrations of dissolved hydrocarbons in the vicinity of the UST <br /> cavity <br /> Please call Mr Glenn Matteucci, ERI's project manager for the site, at (415) 382-5994 if you have <br /> questions regarding this letter <br /> • Sincerely, <br /> Environmental Resolutions, Inc <br /> &UA L4 <br /> ED G�O� Robert A Saur <br /> Staff Geologist <br /> o 4313 <br /> Oohn B Bobbitt <br /> Q� R G 4313 <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.