Laserfiche WebLink
I/ {t <br /> 1-10 205512 1101 7o5LO Facility 5886,Stockton,Califonna Aril 22 2002 <br /> compressor, and programmable tiler/controller On February 21, 2002, the groundwater remediation <br /> system was activated <br /> Soil Stockpile Disposal <br /> Approximately 8 5 tons of soil cuttings were generated during drilling activities at the site <br /> Tim A Manley Trucking, of Sacramento, California, under direct contract to Tosco, transported the <br /> soil to the Forward, Inc landfill in Manteca, California, for disposal The soil disposal confirmation is <br /> provided in Attachment F <br /> FUTURE WORK <br /> During September 2002, Tosco and ERI will provide a Remediation Status Report evaluating the <br /> remediation system effectiveness following 6 months of operation <br /> DOCUMENT DISTRIBUTION <br /> ERI recommends copies of this report be forwarded to <br /> Ms Margret Lagorio <br /> Site Mitigation Unit <br /> San Joaquin County Public Health Services <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> Mr Marty Hartzell <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> • 4 <br />