My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2900 - Site Mitigation Program
>
PR0540973
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 10:01:08 PM
Creation date
3/11/2020 11:57:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0540973
PE
2960
FACILITY_ID
FA0023449
FACILITY_NAME
76 STATION
STREET_NUMBER
1206
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10416004
CURRENT_STATUS
01
SITE_LOCATION
1206 MARCH LN
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE MITIGATION PROGRAM CHECKLIST <br /> SITE LO7-formhasbeen <br /> IN <br /> FA#: An 7i7 PR# <br /> DATEACTIVITY <br /> INITIAL <br /> submittal and make sure all documents/fees have been submitted. <br /> st documents/fees not submitted. <br /> e MFR to Accounting to ensure project has a FA#and a PR#. The PR#for a <br /> does not change. If the lead agency changes, a new PR#must be created under <br /> stin FA.R for Work Plan Review— Enterthe data into the SR form in EC making sure <br /> he SR to the related FA. Generate an SR#and document on the permit form. If <br /> it form has been submitted, record the information on a golden rod Service <br /> W/o Request form. Use this SR#on your DAR to track time spent obtaining documents/ <br /> fees, reviewing work plan, issuing permits, coordinating field work activities, reviewing <br /> subsequent report/sample results, making notifications/referrals. <br /> Work Plan SR#: <br /> ./ Review Work Plan to ensure scope of work matches the scope of work approved by <br /> 7 the lead agency and that the mw construction/destruction meets SJC Ordinance Code <br /> and well standards. <br /> Issue Permits - Enter permit information into WP form in EC, link to the FA#for the <br /> / project, and obtain a WP#. Use this WP#on DAR to track time spent in the field for the <br /> v specific mw/boring activity specified on the permit. <br /> WP#: , P(M -7 Scope: <br /> WP#: 7.1 1 Scope: E.PMr/I p <br /> WP# Scope: h1�.lih.• <br /> WP#: Scope: <br /> WP#: Scope: <br /> After scope of work on the well and boring permit WPs are complete, update the <br /> following fields in the Well Permit Approval Dates section of the WP form in EC: Plan <br /> Status—choose 'Finaled'; Final Inspection—enter date permit finaled. <br /> After all field work is complete, flag calendar to follow up on report of findings. <br /> Report Review: <br /> • Environmental Assessment Projects -Review report to determine if <br /> contamination was found. If contamination present, print out a 5021 and request a <br /> new PR#be issued under PE 2960. Provide 5021 to Accounting Office for <br /> processing. Complete a Prop 65 Notification. Send notification letter to CVRWQCB. <br /> • EHD Lead Oversight Projects-Review report to determine next phase of work to <br /> be conducted or if closure is appropriate. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> • Other Lead Agency Projects-Review report to determine if any immediate public <br /> health issues are found. If public health concerns are found, notify supervisor <br /> immediately for follow up and further notifications. Complete Prop 65 for any new <br /> contaminants found at the site. <br /> After scope of work for the project SR is complete, update the following fields in the <br /> Service Request Approval Dates section of the SR form in EC: Plan Status—choose <br /> 'Finaled'; Final Inspection—enter date work finalized. <br /> EHD-29 8/15/17 Site Mitigation Program Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.