Laserfiche WebLink
PROJECT: Circle K Store 05445 WELL/PROBEHOLE/BOREHOLE NO: <br /> LOCATION: Stockton, CA p <br /> PROJECT NUMBER: 77CP.05445.00.0002 B-8 PAGE 2 OF 3 Cs C (a N <br /> DRILLING: STARTED 1/17/07 COMPLETED: 1118/07 NORTHING(ft): EASTING(ft): <br /> INSTALLATION: STARTED 1/17/07 COMPLETED: 1/18/07 LATITUDE: LONGITUDE: <br /> DRILLING COMPANY: CASCADE DRILLING GROUND ELEV(ft): TOC ELEV(ft): <br /> DRILLING EQUIPMENT: Air Knife/ LAR CME 75 INITIAL DTW(ft): BOREHOLE DEPTH(ft):50.0 <br /> STATIC DTW(ft): WELL DEPTH(ft):--- <br /> DRILLING METHOD: HOLLOW STEM AUGER WELL CASING DIAMETER(in):--- BOREHOLE DIAMETER(in):8 <br /> SAMPLING EQUIPMENT: SPLIT SPOON LOGGED BY:J.MUNN CHECKED BY:E. SIMONIS <br /> L - j N <br /> E ani a��i m uvi Description E Time N o o a o,E Borehole <br /> o - Sample ID w m v n p` Backfill <br /> 2 a' <br /> No Recovery 42 U.0 <br /> 9 <br /> Same as 25ft sample.WI _ 0930 1 14 <br /> 0930 30_`:-.*-:.-.-. ML SILT TH SAND;ML;brown;fine-grained; B-8@30' 18 0.0 30 <br /> low plasticity;soft;moist;no odor;no staining; <br /> 01585 <br /> No Recovery <br /> ML SILT;ML;dark brown;low plasticity;stiff; 10 <br /> moist;no odor;no staining;(0,0,100) <br /> 0955 35 0955 1.5 20 <br /> B-8@35' 34 0.0 35 Portland <br /> No Recovery Cement Grout <br /> 10 <br /> 1025 40 ML SILT;ML;yellowish brown;low plasticity;stiff; 1025 1 21 30 2.0 40 <br /> moist;no odor;Little hydrocarbon staining B-8@40' <br /> 00100 <br /> No Recovery <br /> S <br /> 0 <br /> z <br /> 0 <br /> 9 <br /> Same as 40ft sample but no staining;brown; 1045 1 22 <br /> 1045 45 hard. 1.0 45 <br /> B-8@45' 28 <br /> No Recovery <br /> C6 <br /> 0 <br /> m <br /> Same as 45ft sample. <br /> 0 9 <br /> 1.5 19 <br /> W1110 21 0.0 <br /> Hole terminated at 50 feet. <br />