Laserfiche WebLink
K!_ FINFEI nFR <br /> On May 6, 2003, Kleinfelder's Staff Geologist arranged for the top of the septic tank to be <br /> uncovered and found the tank to be in sound condition. A single sludge sample was collected <br /> from inside the tank and submitted for laboratory analysis. The sludge sample was analyzed for <br /> total purgeable petroleum hydrocarbons as referenced to gasoline (TPH-g), total extractable <br /> petroleum hydrocarbons as referenced to diesel (TPH-d), and total recoverable petroleum <br /> hydrocarbons as referenced to oil and grease (TRPH). The laboratory results reported a <br /> concentration of TPH-g - 26 milligrams/kilogram (mg/kg), TPH-d - 900 mg/kg, and TRPH-8,500 <br /> mg/kg. Based on the results of the tank sludge sample, a workplan was requested by the EHD to <br /> conduct further soil and groundwater characterization (if needed) at the site. Kleinfelder <br /> prepared the workplan and submitted a copy to Mr. Mike Infuma from the EHD for review. Mr. <br /> Infuma expressed willingness to allow a new septic system to be re-permitted if it could be <br /> shown that leakage from the septic system has not impacted soil and/or groundwater beneath the <br /> site. <br /> FIELD ACTIVITIES <br /> Septic Tank Contents Characterization <br /> As previously summarized above, a sample was drawn on May 6, 2003 by Kleinfelder and <br /> analyzed. The septic sludge sample was analyzed for TPH-g, TPH-d, and TRPH. The laboratory <br /> results reported concentrations of TPH-g - 26 mg/kg, TPH-d - 900 mg/kg, and TRPH -8,500 <br /> mg/kg. A supplemental characterization of the tank contents was performed on September 3, <br /> 2003. The results showed small concentrations of Volatile Organic Compounds (VOC) 1,4- <br /> dichlorobenzene (0.0056 mg/kg), and metals; cadmium-1.5 mg/kg, total chromium- 4.0 mg/kg, <br /> hexavalent chromium 1.0 mg/kg, nickel- 5 mg/kg, lead- 12 mg/kg, and zinc- 400 mg/kg. <br /> Soil Sampling <br /> On August 13, 2003 Kleinfelder advanced a total of 5 hand auger borings (B-1 through B-5) to <br /> investigate the shallow subsurface soils near the septic tank, leach line, and seepage pit. A <br /> backhoe operated by Parrish and Sons Septic Service was used to excavate at predetermined <br /> intervals along the leach line. The intervals were chosen in accordance with the State of <br /> California Tri-Regional Board Staff Recommendations for Initial Evaluation and Investigation of <br /> Underground Tanks dated August 10, 1990. One of the soil samples (B-1) was collected from <br /> native soil approximately 6 inches from beneath the south end of the tank. One of the soil <br /> borings (B-2) was advanced on the northern end of the septic tank near the position of where the <br /> flange or transition from the tank to the leach line occurs. A total of two soil borings (B-3 and B- <br /> 4) were advanced at an angle along the excavated leach line, spaced at 20 foot intervals, to the <br /> area directly below the gravel pack of the leach line and into native soil. The final boring (B-5) <br /> was advanced next to the transition point of the leach line and seepage pit, and also below the <br /> gravel pack of the leach line and into native soil. See Plate 2 for the soil sampling locations. <br /> On August 29, 2003 confirmation sampling was performed by Kleinfelder with the EHD <br /> regulator (Mr. Mike Infama) present. One additional soil sample (B-6) was collected for <br /> laboratory analysis. <br /> 34202.E01 /ST03R1609 Page 2 of 7 <br /> Copyright 2003 Kleinfelder,Inc. October 31,2003 <br />