My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARINERS
>
9099
>
2900 - Site Mitigation Program
>
PR0526347
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 2:29:51 PM
Creation date
3/11/2020 1:48:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526347
PE
2950
FACILITY_ID
FA0017829
FACILITY_NAME
KELLEY FARM
STREET_NUMBER
9099
Direction
N
STREET_NAME
MARINERS
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
07113011
CURRENT_STATUS
01
SITE_LOCATION
9099 N MARINERS DR
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In KLEINFELDER <br /> WORKPLAN <br /> GROUNDWATER LEVEL MONITORING PROGRAM <br /> THE SANCTUARY PROJECT <br /> STOCKTON, CALIFORNIA <br /> INTRODUCTION <br /> This workplan was developed after Kleinfelder's correspondence and meeting with Mr. <br /> Chris Conklin of Grupe, Mr. Heydar Massoudi, and Mr. Rod Gray of Siegfried <br /> Engineering, Inc. (Siegfried) on behalf of Sanctuary by Grupe, LLC (Grupe) and is a <br /> preliminary understanding of Grupe's desires and the needs of the Sanctuary Project. <br /> The Site Map is included in Plate 1, Typical Kleinfelder Field Protocols in Appendix A, <br /> and the Site Health and Safety Plan is included in Appendix B. <br /> SCOPE OF SERVICES <br /> The scope of services will include the following: <br /> Task 1 Piezometer Installation. Development and Surveying <br /> 1.1 Permitting and Pre-field Activities <br /> The EHD requires completion of a well permit, and payment of fees prior to installation <br /> of piezometers. Because the piezometers are being installed to evaluate the <br /> groundwater conditions, we anticipate that submittal of the workplan to EHD will be <br /> necessary in accordance with the EHD Unit IV. A copy of this workplan will be <br /> submitted with the EHD permit application along with the required fees. The permit <br /> must be approved prior to drilling activities and sampling. <br /> The drilling subcontractor will contact Underground Service Alert and the drilling <br /> locations marked in white paint at least 48 hours prior to conducting fieldwork, and will <br /> notify local utilities of our proposed subsurface assessment. <br /> 1.2 Piezometer Installation <br /> At this time, Kleinfelder proposes to install six piezometers to monitor existing <br /> groundwater levels at the site. The piezometers will be located throughout the <br /> development boundaries in order to assess the groundwater levels in various locations. <br /> Please see the attached Plate 1 Site Map for the proposed piezometer locations. The <br /> installation of the piezometers will be completed under the direct supervision of a <br /> California State licensed Engineer or Geologist. <br /> The soil borings will be drilled with a truck mounted drill rig equipped with at least an 6- <br /> inch hollow stem augers. We propose to advance the borings to a total depth of <br /> approximately 25-feet below ground surface (bgs) for the completion of each piezometer. <br /> 71812.H01/ST06R658/JDZ:ly Page 1 of 4 <br /> 0 2006 Kleinfelder, Inc. June 22, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.