My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARINERS
>
9099
>
2900 - Site Mitigation Program
>
PR0526347
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 2:29:51 PM
Creation date
3/11/2020 1:48:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0526347
PE
2950
FACILITY_ID
FA0017829
FACILITY_NAME
KELLEY FARM
STREET_NUMBER
9099
Direction
N
STREET_NAME
MARINERS
STREET_TYPE
DR
City
STOCKTON
Zip
95219
APN
07113011
CURRENT_STATUS
01
SITE_LOCATION
9099 N MARINERS DR
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KLEINFELDER <br /> Individual monthly monitoring reports will be prepared describing the observed water <br /> elevations and conditions of each monitoring point. We estimate up to at least twelve <br /> consecutive months will be evaluated. <br /> ASSUMPTIONS AND CLIENT RESPONSIBILITIES <br /> The proposed scope of services are based on the following: <br /> • The client will provide Kleinfelder with the authorization to access the site. The <br /> client will provide a written right of entry authorization, if requested. <br /> • The site is accessible with a 2-wheel drive truck mounted drilling rig for drilling <br /> and installing the piezometers and test wells. The site is accessible with at least <br /> a 4-wheel drive truck for groundwater level monitoring purposes. <br /> ANTICIPATED SCHEDULE <br /> We anticipate Task 1 to require approximately 6 weeks to complete. The initial report <br /> of findings would be prepared approximately 3-4 weeks following the completion of <br /> Task 1. <br /> The following table outlines the tasks and anticipated timeframe to complete the tasks. <br /> Task Description ' Time Frame <br /> Task 1 Permits, Piezometer Installation (6), Development, and <br /> Survey. 3 weeks <br /> Task 2 Reporting-Initial (one time) 34 weeks following the <br /> completion of Task 1 <br /> LIMITATIONS <br /> The proposed scope of service requested by Grupe is limited to evaluating the current <br /> groundwater conditions. The scope of services described here is not intended to be <br /> inclusive, to identify all potential concerns, or to eliminate the possibility of <br /> environmental problems. Within current technology, no level of assessment can show <br /> conclusively that a property or its structures are completely free of hazardous <br /> substances. Therefore, Kleinfelder cannot offer a certification that the property is clear <br /> of environmental liability. <br /> Kleinfelder will assume no responsibility or liability whatsoever for any claim, loss of <br /> property value, damage, or injury which results from pre-existing hazardous substances <br /> being encountered or present on the project site, or from the discovery of such <br /> hazardous substances. Kleinfelder offers a range of investigative and engineering <br /> services to suit the varying needs of our clients. Although risk can never be eliminated, <br /> more detailed and extensive investigations yield more information, which may help <br /> understand and manage the degree of risk. Since such detailed services involve <br /> greater expense, our clients participate in determining the level of service, which <br /> 71812.H01/ST06R658/JDZ:ly Page 3 of 4 <br /> ©2006 Kleinfelder, Inc. June 22,2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.