My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2900 - Site Mitigation Program
>
PR0541650
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 8:17:58 PM
Creation date
3/11/2020 2:34:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541650
PE
2960
FACILITY_ID
FA0023868
FACILITY_NAME
FORMER USA GASOLINE SERVICE STATION 110
STREET_NUMBER
2132
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
1730635
CURRENT_STATUS
01
SITE_LOCATION
2132 E MARIPOSA RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Usa Gasoline Corporation <br /> • The work products must be acceptable to the County and the Regional Water Quality Control <br /> Board. <br /> • It is my opinion that it is unnecessary to obtain three bids for this scope of work; the Fund's three <br /> bid requirement is waived for this scope of work. <br /> • If a different scope of work becomes necessary,then you must request pre-approval of costs on <br /> the new scope of work. <br /> • Although I have referred to the GHH proposal in my pre-approval above,please be aware that <br /> You will be entering into a private contract: the State of California cannot compel you to sign <br /> any specific contract. This letter pre-approves the costs as presented in the proposal dated July <br /> 25, 1997 by GHH for conducting the work approved by the County for implementing the July <br /> 25, 1997, GHH workplan. <br /> I also want to remind you that the Fund's regulations require that you obtain at least three bids, or a <br /> bid waiver from Fund staff, from qualified firms for all necessary corrective action work. The <br /> legislation governing the Fund requires that the Fund assist you in procuring contractor and <br /> consultant services for corrective action. If you need assistance in contracting for corrective action <br /> services, don't hesitate to call me. <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in the <br /> Reimbursement Requestuest Instructions to confirm that the costs are consistent with this pre-approval <br /> before you will be reimbursed. To make this easier, insure drat your consultant prepares his <br /> invoices to match theformat of the original estimate, and provides reasonable explanations for <br /> any changes made in the scope of work or increases in the costs. When the invoices are submitted <br /> you mast include copies of alk <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence from the County. <br /> Please call if you have any questions; I can be reached at(916)227-4322. <br /> Sincerely, <br /> �JacVater Reso es C ntr Engineer <br /> Technical Review Unit <br /> Underground Storage Tank Cleanup Fund <br /> Enclosure <br /> cc: Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> 7?� Recycled Paper Our mission is to preserve and enhance the quality of California's water resources,and <br /> a ensure their proper allocation and efficient use for the benefit of present and future generations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.