My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005212
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2900 - Site Mitigation Program
>
PR0541650
>
ARCHIVED REPORTS_XR0005212
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 5:47:12 PM
Creation date
3/11/2020 2:44:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005212
RECORD_ID
PR0541650
PE
2960
FACILITY_ID
FA0023868
FACILITY_NAME
FORMER USA GASOLINE SERVICE STATION 110
STREET_NUMBER
2132
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
1730635
CURRENT_STATUS
01
SITE_LOCATION
2132 E MARIPOSA RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Replacement cartridge,, will be available on-site as needed When handling samples, the on <br /> site geologist will wear latex gloves Hard hats will be worn by all personnel on-site when in <br /> proximity of drilling equipment <br />' WORK ZONES AND SECURITY MEASURES <br /> Access to the working zone site will be restricted to authorized personnel A set of cones, <br /> placards, or wide yellow tape, surrounding the site will define the perimeter The Project <br /> Manager will be responsible for site security <br /> DECONTAMINATION MEASURES <br /> Avoidance of contamination whenever possible is the best method for protection On-%rte <br /> ' personnel will avoid sitting, leaning, or placing equipment on VOC-affected soil All <br /> personnel will be advised to wash their hands, neck, and face with soap and water before <br /> ' taking a break or leaving the site Respirator% will be washed with soap and water following <br /> each day's use Drilling and sampling equipment used will be decontaminated by steam- <br /> cleaning Sampling equipment will be decontaminated before each sample is taken and drilling <br /> equipment will be decontaminated before each boring is commenced <br /> GENERAL SAFE WORK PRACTICES <br /> Personal safety and hygiene should be of utmost consideration while on-site To prevent <br /> ingestion of contaminants no person shall be allowed to eat, drink, or smoke on the site <br /> STANDARD OPERATING PROCEDURES <br /> Drillers and other on-site personnel will be briefed on the day of drilling in "tailgate" meetings <br /> as to the day's goals and equipment to be used Anticipated contaminants and emergency <br /> ' procedures will be reviewed Appropriate personal protective equipment will be put on and <br /> verified correct by SSO <br /> Park's on-site Geologist will oversee all field preparations, log all soil borings, consult with <br /> the drillers and crew as necessary and will assure that proper sample handling protocol is used <br /> at all times <br />
The URL can be used to link to this page
Your browser does not support the video tag.