Laserfiche WebLink
'- THIRD AND FOURTH QUARTER, 1999 <br /> . GROUNDWATER MONITORING REPORT <br /> 1 USA STATION#110 -STOCKTON <br /> DECEMBER, 1999 <br />' 4.0 REPORT PREPARATION <br /> Firm Preparing Report. <br /> 1 GHH Engineering, Inc <br /> 8084 Old Auburn Road, Suite E <br />' Citrus Heights, Cahforma 95610 <br /> Report Prepared by: <br />' This report was prepared by GHH Engineering, Inc Mr Richard J Zipp, Principal Hydrogeologist, <br /> is the qualified person responsible for overseeing this project This report was written by Ms <br /> Jennifer L Tucker, Environmental Scientist, and reviewed for technical content by Mr Vern A <br /> Bennett, Project Manager, and Mr Zipp <br /> The analysis and conclusions submitted in this report are based upon GHH's knowledge of the site, <br /> the best available nlformatron obtained from the field investigation, persons knowledgeable about <br /> the site, and local government agencies However, the regulatory agencies may have additional <br /> Mconclusions after they have reviewed and evaluated the data This report was prepared to assist <br /> USA in the evaluation of the site <br /> This report has been reviewed by the client and they are responsible for the findings herein If you <br /> have any questions or need additional information, please call the undersigned at (916) 723-7645 <br /> Thank You, <br /> ' V21er L T cker <br /> Environmental Scientist <br /> &C7— <br /> Vern A Bennett <br /> Project Manager G���tRED oFa<o <br /> Q� RICHARD c�s-� Srikanth Dasappa Date <br /> /0�4 1 USA Gasoline Corporation <br /> Richard J Zipp, R G , G ZIPP <br /> Principal Hydrogeolo is No 3611 <br /> �'9T`S OF CAtVF'3y' <br /> F 15007 111JT1naj1QMR1299 wpd <br /> 4 <br />