Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> • PROJECT NAME QSN 4�11( PROJECT NUMBER5417-S 12- ELL NO 1ti <br /> PROJECT MANAGER _ TYPE OF WELL ✓ Monitonng Extraction Other <br /> RECORDED BY SAMPLED BY F DATE `, _ <br /> I <br /> WELL PURGING INFORMATION t <br /> PURGE VOLUME PURGE METHOD <br /> 2CWell sing Diameter <br /> -inch flinch Other 6ader - Type ?v <br /> �/ !� Pump - Type <br /> Well Total Depth feet below Top of Casing,TD Other - Specify <br /> Depth to Water feet below Top of Casing,WL Hyarocarbon Odors <br /> Yes o <br /> Water Column Length 14tqa feet <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> X X 3 - 7. <br /> C� ` Calculated Purge Volume gallorts <br /> (W Q (Multiplier) (No Volumes) Actual Purge Volume = _gallons <br /> MuMpRer (Casirxj Diameter nches = Gallonsftearfoott Z=01T 4=(-86 5=1 5 8=26 <br /> Groundwater Parameter Measurement Meter TypeI lgbaalibrated _Yes No <br /> TIME ELAPSED DTW pH ECT��AP� TURBOMY REDOX COMMENTS 4 <br /> TIME (G M) (ft) anhowe d F,M <br /> (NM mV <br /> � � f <br /> VAff ASSOCIATE'S INC. <br /> EmmommwrAL,GC-oTECHHXAL AND MAITMALS PROFESMONALS <br />