Laserfiche WebLink
i <br /> GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME USk rr-�aS �l1(9 _ PROJECT NUMBER�„Z5YIZe�5_3_WELL NO <br /> PROJECT MANAGER TT TYPE OF WELL Monitor:ng Extraction Other <br /> RECORDED BY SAMPLED BY A-F DATE <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well Casing Clamet <br /> 2-inch �i flinch Other Bader - Type <br /> Well Total Depth a� ' �? feet below To of Casing,TD "dump - Type v��r��y'�� �, <br /> P P g� Other - Specify <br /> Depth to Water + �- feet below Top of Casing,WL Hydro on Cdors <br /> Water Column Length feet es No <br /> Purge Vo€ume Calculation (Water Column Length x Muitipller x No Volumes = Calculated Purge Volume) <br /> Z2” t X eX = � — Calculated Purge Volume = 5-t 1 allons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume = . allons <br /> {4ult€ €ler (Casfing,Diameter bchesl =s Gallons inear fo2!1 Z=C 17 4=0,66 6,=1 5 6=2"6 <br /> Groundwater Parameter Measurement Meter Type Calibrated ,_Yes_No <br /> TIME ELAPSED FLGWRATE DTW pH EC AP TURaIonY REDOX COMMENTS <br /> TIME (GP" (ft) anhosIrm APE <br /> {�U) mV � M1 �( Lo� <br /> 2- 10 7+ c <br /> 22 .0 <br /> /S-- s P <br /> �- r 2-2-Z G <br /> t Z. .._ <br /> VAW <br /> EH VIAONMlrH7'/IL,GEOTECHNIC <br /> AL IN s <br />