My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012585
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2900 - Site Mitigation Program
>
PR0541650
>
ARCHIVED REPORTS_XR0012585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 7:16:43 PM
Creation date
3/11/2020 3:18:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012585
RECORD_ID
PR0541650
PE
2960
FACILITY_ID
FA0023868
FACILITY_NAME
FORMER USA GASOLINE SERVICE STATION 110
STREET_NUMBER
2132
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
1730635
CURRENT_STATUS
01
SITE_LOCATION
2132 E MARIPOSA RD
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'o <br /> z <br /> 3 <br /> x. <br /> d <br /> 4 <br /> AGS 87031-2 <br /> USA Station Pio. 110 <br /> Stockton, California <br /> w <br /> installation of two additional 2-inch inner-diameter monitoring <br /> and provide <br /> wells to further evaluate the extent of contamination <br /> data on Lf►e direction of ground-water flow. <br /> FIELD WORK AND METHODS <br /> ems personnel were present an August 16 and 20, <br /> Applied GeoSyst <br /> B-1 was drilled <br /> 1987 to drill soil borings B-1 and B-2• <br /> Boring <br /> +- It the product storage tanks near the margins of <br /> to the northwest <br /> the site. Soil Boring B-2 was dr,lled at the northeast edge of <br /> tanks. The borings were located so as <br /> the site, northeast of the <br /> evels at the margins of the site. <br /> to evaluate contaminant l <br /> Soil t,oring B-1 was drilled to a total depth of approximately <br /> 70.5 feet below the ground surface. Boring B-2 reached a total <br /> feet. The equipment ueed for the borings was a <br /> depth of 72.0 <br /> CME-75 drilling rig equipped with 7.5-ich-diameter hollow-stem <br /> n <br /> Inc. , of Pittsburg, <br /> augers and operated by Datum Exploration, <br /> California. The augers were steam cleaned prior to use and <br /> between borings in order to minimize the possibility of down-hole <br /> contamination. <br /> 5 <br /> A0,0#60' Geo.�Vstelns <br />
The URL can be used to link to this page
Your browser does not support the video tag.