Laserfiche WebLink
1444 MARIPOSA <br /> WKA No. 2938.03 <br /> February 1, 1996 <br /> Page 6 <br /> • a site plan showing monitoring well locations <br /> • logs of borings describing soil type, sample locations, and well construction <br /> details <br /> • monitoring well construction details <br /> • laboratory test results with chain-of-custody documentation <br /> • conclusions regarding ground water quality, flow direction, and gradient <br /> beneath the site <br /> • recommendations for further investigation, if necessary. <br /> TIME LINE <br /> Installation of the monitoring wells will begin approximately two weeks from the time SJCPHS <br /> approves this workplan, weather permitting. Our findings will be completed within four weeks <br /> from the time the field work is completed. All work will be performed in accordance with <br /> current state and county protocol and under the direct supervision of a registered geologist with <br /> our firm. <br /> Please call us if you have any questions regarding our proposed scope of work. <br /> Wallace ■ Kuhl & Associates, Inc. <br /> 14— <br /> Matthew <br /> A. Taylor Eric Hubbard <br /> Senior Staff Engineer Registered Geologist #4807 <br /> MAT:EH:sdm <br /> Copy to: Ms. Jan Cordini <br /> `` ,.WP1 <br /> WALUKE•KUHL <br /> RMded paper ErA550CLAM INC. <br />