My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
1444
>
3500 - Local Oversight Program
>
PR0545520
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 5:22:48 PM
Creation date
3/11/2020 3:30:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0545520
PE
3528
FACILITY_ID
FA0006186
FACILITY_NAME
U S RENTALS
STREET_NUMBER
1444
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
02
SITE_LOCATION
1444 E MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1444 MARIPOSA <br /> WKA No. 293 8.04 <br /> April 6, 1999 <br /> Page 3 <br /> gasoline, diesel and motor oil using Modified EPA Method 8015,Benzene, Toluene, <br /> Ethylbenzene, and Total Xylenes(BTEX) using EPA Method 8020, and oxygenated <br /> compounds Ethanol, Tert Butanol,Methyl tert Butyl Ether(MTBE), Di-isopropyl <br /> Ether(DIPE), Ethyl tert Butyl Ether(ETBE), Tert-Amyl methyl Ether(TAME), and <br /> Methanol using EPA Method 8260B <br /> • developing the wells by removing five well volumes and/or until stabilized pH, <br /> temperature, and conductivity readings are attained and the water is relatively free of <br /> sediment <br /> • sampling the three new wells a minimum of 24 hours after development in accordance <br /> with the attached field procedures. In addition, we will sample the existing three wells <br /> but will measure the depth to water during the well purging event to evaluate whether <br /> or not sufficient drawdown takes place during pumping to allow the water table to <br /> intersect the submerged screened interval of the older wells <br /> • conducting a survey of domestic, municipal, agricultural and other wells within a <br /> 2,000-foot radius of the site and providing SJCPHS with information regarding the <br /> well locations and construction details <br /> • providing SJCPHS with an as-built plan of the existing soil vapor extraction <br /> framework. <br /> Ouarterly Groundwater Monitoring and Sampling <br /> The scope of work to perform four quarterly groundwater monitoring and sampling events is as <br /> follows: <br /> • measurement of static water levels in the wells to the nearest 0.01 foot with an <br /> electronic well sounder <br /> • visual examination of surface water from each well for petroleum hydrocarbons <br /> using a clean, clear disposable bailer <br /> INK <br /> WALLACE•KUHL <br /> Recycled paper 6 ASSOCIATES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.