Laserfiche WebLink
Project No. 9688 WORK PLANune 1.1 <br /> J , 1999 <br /> 2373 Mariposa load Mage 9 <br /> lit <br /> •Total Petroleum Hydrocarbons as Gasoline (TPH-G), <br /> *Total Petroleum Hydrocarbons as Diesel (TPH-D), <br /> •Total Extractable Petroleum Hydrocarbons (TEPH), <br /> •Volatile aromatic hydrocarbons Benzene, Toluene <br /> Ethylbenzene and total Xylenes (BTEX), <br /> *Methyl Tertiary Butyl Ether (MTBE); <br /> *Total Lead. <br /> f <br /> All. analyses will be conducted by the State of California certified North State <br /> Environmental laboratory in South San Francisco. The analyses will be <br /> carried out using LUFT manual methods. <br /> Schedule <br /> Permitting and scheduling will begin within one week of receiving approval <br /> of this work plan from the LOP. Actual drilling operations will begin within <br /> one week of approval as the driller's schedule allows. All efforts will be made <br /> to being the drilling as soon as possible. The final report of the soil and <br /> groundwater investigation will be available within 3 weeks of the completion <br /> of all field work. <br /> Report Preparation <br /> A summary report will be prepared upon the completion of all field and <br /> laboratory work. The report will discuss the methods used and will present <br /> the data obtained in graphic and tabular form. Conclusions regarding the <br /> vertical extent of soil contamination and of any gr'o' undwater contamination <br /> along with recommendations for further work will be presented. <br /> Report Distribution i <br /> All reports that are prepared during the continuing work on this project will <br /> be sent to: <br /> li <br /> Mr. Michael Infurna, Senior REHS <br /> Site Mitigation Unit, Environmental Health Division <br /> San Joaquin County Public Health Services a f <br /> 445 N. San Joaquin Street <br /> P.O. Box 388 <br /> Stockton, CA 95201 <br /> f <br /> i <br /> I <br /> i <br /> WILLIAM DUBOVSKY ENVIRONMENTAL <br />