Laserfiche WebLink
Maintenance Building )/ <br /> NORTH <br /> Office <br /> Warehouse Drawing is based on building <br /> building information from Geoligic <br /> Audit Services and Wm. J. <br /> Hunter reports. All <br /> dimesions to be confimed <br /> in the field. <br /> I <br /> I <br /> chain link <br /> fence <br /> I <br /> I <br /> i <br /> I <br /> C I <br /> (WJH) I <br /> B No detectable TPH-G <br /> or BTEX to 36.0' I D <br /> (WJH) No other Analyses I (WJH) <br /> No detectable TPH-Geo ucted I No detectable TPH-G <br /> or BTEX to 36.0' j or BTEX to 35.0' <br /> No other Analyses <br /> conducted I No other Analyses <br /> conducted <br /> Property <br /> I -�• <br /> HC-2S I E line <br /> ®14' I (WJH) <br /> TPH-D=2,500I No detectable TPH-G <br /> I <br /> TPH-G-G 1 <br /> 50 or BTEX— to 35.6' <br /> — B <br /> I <br /> TP <br /> H- <br /> O <br /> _< <br /> 0 `S{ <br /> IN <br /> oother Analyses <br /> =ND <>< ' ?? ><> ::>::>::»>::>::>:. co ducted <br /> BTEX i <br /> VOC=ND <br /> Lead=9.9 <br /> _._ _._._._._._1_._._ .—.—•—•—•—•—•—•—•—•— — — - <br /> (WJH) (WJH) HC-1N <br /> No detectable TPH-G No detectable TPH-G ®14' <br /> or BTEX to 35.5' or BTEX to 36.0' TPH-D=2,500 <br /> No other Analyses TPH-D detected 5.0' 380 ppm TPH-G=100 <br /> conducted 10.5' 430 ppm <br /> 15.5' 490 ppm TPH-MO=110 <br /> HC-3E 20.0' 25 ppm BTEX=ND <br /> 25.0' ND VOC=ND <br /> ®6' 30.0' 4.0 ppm Lead=180 <br /> TPH-D=230 36.0' ND <br /> TPH-G NT 41.0' ND <br /> TPH-MO=<10 46.0' 2.0 ppm <br /> BTEX=NT 50.5' 2.0 <br /> 0 20' VOC=NT <br /> 10, Lead=NT <br /> WILLIAM DUBOVSKY ENVIRONMENTAL Site Plan <br /> Husky Crane Company <br /> 2373 Mariposa Road <br /> Stockton, California <br /> Project Number: 9688 1 By: JNC Scale: 1" = 20' Date: June, 1999 Figure Number: 2 <br />