However, installation of the USA Gasoline monitoring wells has been delayed. Therefore, <br /> we recommend the installation of three additional monitonng wells at the Pacific Gas site <br /> One well should be placed north of MW-2, a second well should be installed northwest of <br /> MW-1, near the structure on-site A third well should be installed northwest of MW-3, near <br /> the southern dispenser island An intenm work plan for the installation of additional wells <br /> is included in Appendix C <br />' 5.2 Hydrocarbon Impacted Soil <br />' Hydrocarbon-impacted soil is present at the site below the original tank excavation <br /> Therefore, after the lateral extent of impacted groundwater has been defined, a remedial <br /> action plan for impacted soil and groundwater should be prepared <br /> ' All stockpiled soil at the site has been characterized Therefore, the remaining stockpiled <br /> soil remaining on-site should be disposed of at a properly licensed facility <br /> 6.0 LIMITATIONS <br /> OurP rofessional services were performed using that degree of care and skill ordinarily <br /> exercised by environmental consultants practicing in this or similar localities The findings <br /> ' were based upon analytical results provided by an independent laboratory Evaluations of <br /> the geologic/hydrogeologic conditions at the site for the purpose of this investigation are <br /> made from a limited number of available data points (i a monitoring wells) and subsurface <br /> conditions may vary away from these data points No other«,arranty, expressed or implied, <br /> is niade as to the piofessionaI recommendations contained in this report <br /> 1 <br /> Cwbywl Audi=S..,n I" <br /> P.err.6.,CR4A2 9+1652 5 <br /> 1 <br />