Laserfiche WebLink
1 II <br /> TABLE OF CONTENTS <br /> Page <br /> 1.0 INTRODUCTION I <br /> ' <br /> 2.0 BACKGROUND 1 <br /> 21 Site Location 1 <br /> 22 Tank Removal 1 <br /> 23 Drilling 1 <br /> 24 Excavation and Backfilling 4 <br /> 25 Monitoring Well Installation and Assessment 4 <br /> 26 Groundwater Monitoring 4 <br /> 3.0 PROCEDURES 5 <br /> 31 Monitoring Well Purge Procedure 5 <br /> ' <br /> 32 Groundwater Sample Collection and Analysis 5 <br /> 33 Stockpiled Soil Sample Collection and Analysis 6 <br /> 40 FINDINGS 6 <br /> 41 Relative Groundwater Elevation and Gradient 6 <br /> 42 Laboratory Evidence of Groundwater Contamination 6 <br /> 43 Laboratory Evidence of Stockpile Soil Contamination 6 <br /> 5.0 CONCLUSIONS & RECOMMENDATIONS 8 <br /> 51 Hydrocarbon Impacted Groundwater S <br /> 52 Hydrocarbon Impacted Soil 9 <br /> 6.0 LIMITATIONS 9 <br /> ' LIST OF FIGURES <br /> ' Figure 1 - Location Map 2 <br /> Figure 2 - Site Plan 3 <br /> Figure 3 - Relative Elevation of Piezometnc Surface 7 <br /> LIST OF TABLES <br /> ' Table 1 - Relative Groundwater Elevations 5 <br /> Table 2 - Analytical Results of Water Samples 8 <br /> ' LIST OF APPENDICES <br /> Appendix A - Stabilization Data <br /> Appendix B - Analytical Results of Water Samples <br /> Appendix C - Interim Work Plan <br /> t <br /> ' ! rr rrR ia1 !llrTlf 1 ti t ' ti <br />