Laserfiche WebLink
All work for this project was performed under the responsible charge of a Registered Geologist.Our <br /> professional services were provided using that degree of care and skill ordinarily exercised by <br /> environmental consultants practicing in this or similar localities.The findings were mainly based upon <br /> analytical results provided by an independent laboratory.Evaluations of the hydrogeological conditions <br /> at the site for the purpose of this investigation are made from a limited number of available data <br /> points (i e. monitoring wells), and subsurface conditions may vary away from these data points.The <br /> information contained in this report has received appropriate technical review and approval.This <br /> acknowledgement is made in lieu of all warranties, either expressed or implied. <br /> Project MONITORING WELL INSTALLATION AND QUARTERLY REPORT <br /> Pacific Gas <br /> 2088 Mariposa Road <br /> 1 Stockton, California <br /> Performed by Geological Audit Services, Inc. <br /> ' 1$03 West March Lane, Suite A <br /> Stockton, California 95207 <br /> Field Activities Conducted by <br /> u-R3 <br /> J Z//ell,��J <br /> Kevin Mckibben Date ;ttTipton Da e <br /> Staff Geologist Environmental Technician <br /> ' Report Prepared by <br /> 1 <br /> Bob Marty V Date <br /> Project Manager <br /> Reviewed and Approved by- <br /> QED GFO`O <br /> ' Victor B Cherven Date No 3475 <br /> Principal Geologist <br /> Registered Geologist #3475 9 <br /> ��Qr CALIEO� <br /> L J <br /> 1 <br />