Laserfiche WebLink
Geological2ecknics Inc. �✓ `� Page 3 <br /> soil Boring Installation Work Plan <br /> Murray <br /> Project No.675.2 <br /> November 6, 1998 <br /> 3.0 SCHEDULE & REPORTING <br /> It is anticipated that we will begin fieldwork immediately following work plan approval and <br /> issuance of a boring permit. A registered professional geologist responsible for the work will <br /> supervise the project. Copies of the report will be forwarded to SJC PHS/EHD. <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with accepted <br /> geologic and hydrologic standards of the State of California accepted and in effect at the time <br /> of this investigation. Geological Technics Inc. is not responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> GEOLOGICAL TECHNICS INC. <br /> Michael J. Niemi <br /> Geologist <br /> Raynold 1. Kablanow Il, Ph.D. <br /> California Registered Geologist#5234 <br /> Registered Environmental Assessor#901 <br />