Laserfiche WebLink
1 <br /> 1444 MARIPOSA ROAD <br /> ' WKA No 2307 02 <br /> . December 4, 1992 <br /> r Page 5 <br /> gasoline and 0.5 µg/L for BTEX. Well installation, completion, and sampling would be conducted <br /> ' under the supervision of a California-registered geologist <br /> ' REPORTING <br /> ' Upon completion of our field work and the laboratory testing, we will prepare a formal report that will <br /> include <br /> ' • a site plan showing soil boring and well locations <br /> • logs of the soil and well borings <br /> monitoring well construction details <br /> ' • laboratory test results with chain-of-custody documentation <br /> • conclusions regarding the extent of soil contamination in the vicinity of the former tanks <br /> ' 9 recommendations for further investigation, if necessary <br /> '. TIME LINE <br /> Our field investigation will begin within one week from the tune this workplan zs approved Our report <br /> ' of findings will be completed within four weeks from the tune the field investigation is completed <br /> ' Please call us if you have any questions regarding our proposed scope of work <br /> Wallace ■ Kuhl & Associates, Inc <br /> ' Mike Keenan <br /> Staff Geologist <br /> p,E.Q G E <br /> 04 c/ <br /> ERIC.J `P-` <br /> HUBBARp <br /> Eric Hubbard No 4807 <br /> ' Registered Geologist #4807 <br /> MK EH sdm sdr <br /> ' M12307-02 TVP <br /> ' WALLACE•KUHL <br /> RegdrdP.per FiASSOCIATES INC <br />