My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
4900
>
2900 - Site Mitigation Program
>
PR0500171
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2026 2:25:17 PM
Creation date
3/12/2020 11:23:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0500171
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0004666
FACILITY_NAME
4900 E. MARIPOSA SITE ASSESSMENT
STREET_NUMBER
4900
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17916021
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4900 E MARIPOSA RD STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> 1.0 INTRODUCTION...............................................................................................................................1 <br /> 2.0 PROJECT BACKGROUND..............................................................................................................l <br /> 3.0 SUBSURFACE INVESTIGATION PLAN.......................................................................................1 <br /> 4.0 FIELD PROCEDURES......................................................................................................................1 <br /> 4.1 SITE PREPARATION........................................................................................................................ 1 <br /> 4.2 SOIL SAMPLING METHODOLOGY ..............................................................................................2 <br /> 4.3 GROUNDWATER SAMPLING METHODOLOGY........................................................................2 <br /> 5.0 LABORATORY ANALYSES............................................................................................................2 <br /> 6.0 REPORTING......................................................................................................................................3 <br /> 7.0 PROJECT SCHEDULE.....................................................................................................................3 <br /> APPENDICES <br /> APPENDIX A <br /> Figure 1 —Vicinity Map <br /> Figure 2—APN Map <br /> Figure 3 —Proposed Boring Location Map <br /> APPENDIX B <br /> Site Specific Health and Safety Plan <br /> ILI CONDOR <br />
The URL can be used to link to this page
Your browser does not support the video tag.