Laserfiche WebLink
RESIVA <br /> SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> On April 25, 1991, one 2;000-gallon underground (u/g) storage tank was removed. Two <br /> soil samples collected from beneath the tank exhibited detectable levels of gasoline <br /> hydrocarbons. <br /> WORK PLAN <br /> Task One: Excavation of approximately 20 yards of hydrocarbon impacted soil from the <br /> former tank pit area. <br /> Task Two: Confirmation sampling. Five confirmation soil samples will be collected to <br /> verify source removal. <br /> Task Three: Backfilling: Subsequent to the collection of the confirmation soil samples the <br /> excavated area will be backfilled. <br /> Task Four: Impacted soil characterization. One two-container composite sample will be <br /> collected from the excavated hydrocarbon impacted soils for characterization. <br /> t <br /> 4 <br /> PAGE 2 <br />