Laserfiche WebLink
GROUNDWATER SAMPLING FORM <br /> PROJECT INFORMATION <br /> PROJECT NAME I>S 'CVs �-- PROJECT NUMBER_q'-4 —'-Aro 4 WELLNO <br /> PROJECT MANAGER TYPE OF WELL Monitoring Extraction Other <br /> RECORDED BY SAMPLED BY DATE 02-75ci7 <br /> WELL PURGING INFORMATION <br /> PURGE VOLUME PURGE METHOD <br /> Well C sing Diameter <br /> -inch flinch Other Bader - Type <br /> �G <br /> Well Total QepthJ6-6(P feet below lop of Casing,TQ Pump - Type <br /> - Specify <br /> Depth to Water `33 feet below Top of Casing WL Hydrocarbon Odo <br /> Water Column Length�eet Yes No <br /> Purge Volume Calculation (Water Column Length x Multiplier x No Volumes = Calculated Purge Volume) <br /> 1Qo'-3 X 0 X _ 15 Calculated Purge Volume = �] ' _gallons <br /> (WCL) (Multiplier) (No Volumes) Actual Purge Volume gallons <br /> Multiplier (Casing Diameter Inches = Gationsliinear toot 2=017 4=0 66 6=1 5 8=2 6 <br /> Groundwater Parameter Measurement Meter Type S�-3 Calibrated 2Yes_No <br /> TIME ELAPSED FLOWRATE DTW pH EC TEM TURBIDITY REDOX COMMENTS <br /> TIME (GPK (ft) onhoslem eg C (NTU) mV <br /> c�9aD 3 G I(� ON <br /> o \"A q o G ` 135-0 I q 4 ° �a <br /> Og2(p 65:1 /to-7Z�Z �7 E370 I� ig "i T3' <br /> O 3 I <br /> (0-7 ,2_9 1 70 Zp ! f <br /> SNTH <br />