My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005272
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
3500 - Local Oversight Program
>
PR0545532
>
ARCHIVED REPORTS_XR0005272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:07:19 AM
Creation date
3/12/2020 11:46:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005272
RECORD_ID
PR0545532
PE
3528
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Names of collectors <br /> - Dates and times of collection <br /> - Purpose of sample <br /> ' - Sample distribution (e.g. , laboratory, archive, etc. ) <br /> ' - Field observations <br /> -- Field measurements (e.g. , PID readings, pH, <br /> ' - conductivity, water levels) . <br /> Other data records (e.g. development log, soil sampling <br /> report, well log, etc. ) <br /> ' Procedures for surface soil collection from shallow test <br /> pits are discussed in the appended Soil Sampling Protocol. <br /> ' Soil samples will be collected using decontaminated <br /> equipment and placed in laboratory prepared containers. <br /> All drilling equipment, pipe, and materials coming in <br /> contact with the borehole material will be decontaminated <br /> before use according to the procedures described in Section <br /> 6.0. All sampling equipment will be decontaminated prior to <br /> sampling following these same procedures. <br /> Soil samples will be collected as monitoring well drilling <br /> progresses . All downhole drilling equipment will be <br /> decontaminated prior to use and between use for each well <br /> according to the procedures described in Section 6.0. <br /> ' All well construction material, including well casing, <br /> screen, and well caps, will be decontaminated prior to <br /> installation by steam cleaning according to the procedures <br /> described in Section 6.0. <br /> To prevent the transfer of surface contamination to a well, <br /> ' a Portland cement and bentonite surface seal will be <br /> installed in conformance with regulatory requirements. The <br /> casing will be fitted with a water tight locking cap. No <br /> solvent or glue will be used in well construction. The <br /> wellhead will be contained below grade in a water-tight <br /> traffic rated box or otherwise protected from damage. <br /> ' In order to assure that groundwater samples are obtained <br /> from formation material and not from the filter pack, wells <br /> w3.11 be purged in accordance with the appended <br /> ' Well Development Protocol. <br /> Samples will be placed in laboratory prepared containers, <br /> appropriate for the analyses specified as indicated on Table <br /> 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.