My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005272
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
3500 - Local Oversight Program
>
PR0545532
>
ARCHIVED REPORTS_XR0005272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:07:19 AM
Creation date
3/12/2020 11:46:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005272
RECORD_ID
PR0545532
PE
3528
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Development Protocol <br /> Groundwater monitoring wells will be surged developed prior to <br /> setting the surface seal. Approximately 10 times the volume of <br /> water in the casing will be withdrawn if possible. Casing <br /> volumes will be calculated in the following manner: <br /> Volume of Schedule 40 PVC Pipe <br /> ' Diameter Z.D. Volume <br /> (inches) (inches) Gal/linear ft. <br /> t ---- ---------- ----------- ---------- <br /> 2 2.067 o <br /> .17 <br /> ' 4 4.026 0.66 <br /> ' Volume of Open Borehole and Annular Space <br /> Between Casing and Hole <br /> Volume/ Volume/ <br /> Hole linear ft. Nominal linear ft. of* <br /> Diameter of hole Casing Diameter Annular Space <br /> ( inches) Gal. Cu. ft. (inches) Gal. Cu. Ft. <br /> ----------------------------------------------------------------- <br /> ' 7.25 2.14 0.29 2 1.91 0.26 <br /> 8.25 2.78 0.37 2 2. 55 0.34 <br /> 10.25 4.29 0. 57 2 4.06 0. 54 <br /> ' 10.25 4.29 0. 57 4 3.46 0.46 <br /> 12.25 6.13 0. 82 4 5.30 0.71 <br /> ' *Note: Annular volumes will be multiplied t plied by 30$ to account for <br /> porosity of filter pack. <br /> If the aquifer is slow to recharge, development will continue <br /> until recharge is too slow to practically continue. The volume <br /> of water produced versus time will be recorded. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.