My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005272
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
3500 - Local Oversight Program
>
PR0545532
>
ARCHIVED REPORTS_XR0005272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:07:19 AM
Creation date
3/12/2020 11:46:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005272
RECORD_ID
PR0545532
PE
3528
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Soil Sampling Protocol <br /> 1 . Sample Collection During Drilling Activities <br /> ' A proposal will be submitted to the lead Regulatory Authority <br /> with proposed boring/sampling locations. The exact location <br /> and number of borings at each site will be determined in the <br /> ' field by the Project Geologist/Engineer. <br /> Prior to arriving at the sample site, the drill rig/augers <br /> ' will be steam cleaned and all sample equipment will be <br /> cleaned. Cleaning will be conducted on-site on all sampling <br /> equipment between each sample interval. <br /> ' Soil samples will be obtained using a California modified <br /> split-spoon sampler containing three, six inch long, two inch <br /> diameter brass tubes. The sampler will be driven 18 inches <br /> ' ahead of the hollow stem auger by a 140 pound hammer with a <br /> 30 inch drop in accordance with American Society for Testing <br /> and Materials (ASTM) Methods D 1586-84 for split barrel <br /> ' sampling of soil and D 1587-83 for thin-walled tube sampling <br /> of soils. The blows required to drive the sampler each six <br /> inch interval will be recorded on the boring log. The <br /> sampler will be removed from the boring and opened to reveal <br /> the brass tubes . The bottom tube will be capped with <br /> aluminum foil and plastic end caps, taped and labeled with <br /> the following information_ date, time, project ID, sample <br /> ' ID, name of sampler and type of analysis. This sample will <br /> be immediately placed into a cooler containing dry ice or <br /> frozen "blue ice" . A "high-low" temperature recording <br /> ' thermometer will accompany sample shipments to ensure proper <br /> temperature maintenance. The samples will be delivered to a <br /> state certified laboratory under chain-of-custody protocol <br /> within 48 hours of sampling, when ever possible. <br /> ' Soil in the uppermost brass tube will be described according <br /> to ASTM standard practice for description and identification <br /> ' of soils (ASTM D-2488-84 ) . Stratigraphic, genetic and other <br /> data/interpretations will also be recorded. Soil properties <br /> also be noted in the middle brass tube and from the sampler <br /> ' shoe. Alternatively the second sample tube may be used with <br /> the uppermost tube for preparation of duplicates. These <br /> field observations will be noted on a log prepared for each <br /> boring/well. <br /> During sampling, latex gloves will be worn to prevent cross- <br /> contamination with other samples. The disposable gloves will <br /> be discarded after collecting samples from each 18-inch <br /> sample drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.