My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005273
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
3500 - Local Oversight Program
>
PR0545532
>
ARCHIVED REPORTS_XR0005273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:10:52 AM
Creation date
3/12/2020 11:47:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005273
RECORD_ID
PR0545532
PE
3528
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Volume of Open Borehole and Annular Space <br /> Between Casing and Hole <br /> t <br /> Volume/ Volume/ <br /> ' Hole linear ft. Nominal linear ft. of* <br /> Diameter of hole Casing Diameter Annular Space <br /> ( inches) Gal. Cu. ft. ( inches ) <br /> ' } Gal <br /> ------------------------------------------- -------- - Cu Ft. <br /> --- --7.25 <br /> 2.14 0.29 2 1 .91 0. 26 <br /> ' 8.25 2.78 0.37 2 2.55 0.34 <br /> 10. 25 4.29 0. 57 2 4.06 0. 54 <br /> 10. 25 4.29 0.57 4 3 .46 0. 46 <br /> 12.25 6 .13 0. 82 4 5.30 0.71 <br /> *Note: Annular volumes will be multiplied by 30$ to account for <br /> porosity of filter pack. <br /> ' If the aquifer is slow to recharge, development will <br /> continue until recharge is too slow to practically continue. <br /> The volume of water produced versus time will be recorded. <br /> All withdrawn groundwater will be stored on-site in 55 <br /> gallon waste drums unless permission is granted by the <br /> appropriate regulatory agency to discharge the water to the <br /> ground surface or sanitary sewer. Drummed water will be <br /> labeled with the source of the water to help ensure <br /> appropriate disposal based on contamination levels. <br /> ' 11 .0 Soil Sampling Protocol <br /> ' 11 . 1 Sample Collection During Drilling Activities <br /> A proposal will be submitted to the lead Regulatory <br /> Authority with proposed boring/sampling locations . The <br /> ' exact location and number of borings at each site will be <br /> determined in the field by the Project Geologist/Engineer. <br /> ' Prior to arriving at the sample site, the drill rig/augers <br /> will be steam cleaned and all sample equipment will be <br /> cleaned. Cleaning will be conducted on-site on all sampling <br /> tequipment between each sample interval. <br /> Soil samples will be obtained using a California modified <br /> split-spoon sampler containing three, six inch long, two <br /> inch diameter brass tubes. The sampler will be driven 18 <br /> inches ahead of the hollow stem auger by a 140 pound hammer <br /> with a 30 inch drop in accordance with American Society for <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.