My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005273
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2431
>
3500 - Local Oversight Program
>
PR0545532
>
ARCHIVED REPORTS_XR0005273
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 2:10:52 AM
Creation date
3/12/2020 11:47:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005273
RECORD_ID
PR0545532
PE
3528
FACILITY_ID
FA0022329
FACILITY_NAME
BLINCO TRUCKING
STREET_NUMBER
2431
Direction
E
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17130003
CURRENT_STATUS
02
SITE_LOCATION
2431 E MARIPOSA RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WaterWork <br /> Health and Safety Plan <br /> Underground Tank Investigation <br /> ' INTRODUCTION <br /> PURPOSE AND SCOPE <br /> ' The Health and Safety Plan, for underground tank investigations, <br /> Provides for the protection of on-site personnel and the <br /> surrounding community during site characterization activities. <br /> ' The requirements, specifications and procedures presented with <br /> this plan will apply to all personnel on-site, including <br /> employees, sub--contractors, site visitors and regulatory agency <br /> ' personnel. <br /> KEY PERSONNEL <br /> WaterWork ' s Safety Coordinator/Project/ roject Manager will provide <br /> training to site <br /> personnel in the use of safety and personal <br /> protection equipment and will manage the on-site monitoring <br /> Program. The Safety Coordinator/Project Manager will have the <br /> authority to deny access to any individual without the proper <br /> ' training or protective equipment required for the site conditions <br /> or those individuals disregarding site safety procedures. All <br /> site personnel will be under the direction of the Safety <br /> Coordinator/Project Manager. <br /> HAZARD ANALYSIS <br /> Thero ert � <br /> P P y previously operated a gasoline and/or diesel fuel <br /> distribution facility. Historic data and evaluation of <br /> ' subsurface indicate the presence or potential presence of <br /> hydrocarbon fuel contamination. <br /> The activities addressed by this safety plan include surface and <br /> ' subsurface soil and groundwater sample collection. Although <br /> exposure at hazardous levels are unlikely, these activities <br /> present the potential for exposure to toxic materials through <br /> both skin contact and inhalation. The subsurface sampling may <br /> also pose a fire and explosion hazard from gases and vapors <br /> trapped beneath the ground surface. <br />
The URL can be used to link to this page
Your browser does not support the video tag.