Laserfiche WebLink
r <br /> Department of Water Resources, 19671 . Therefore, it is <br /> highly unlikely the fuel components at this site have <br /> affected or will affect drinking water supplies. <br /> 2. 5 Proximity of private, municipal and irrigation wells: <br /> There is one supply well on the subject property. All water <br /> for the site, including sinks and restrooms in the office is <br /> supplied by the well. The location of the on-site well is <br /> shown on Figure 2. Well locations within a one--half mile <br /> radius of the site were requested from the Department of <br /> Water Resources. A well identified as 01N07E17M is located <br /> approximately 400 feet east of the project site. This well <br /> is screened from 144 to 176 feet below grade and is not <br /> expected to be affected by activities associated with this <br /> ' tank closure . <br /> ' 3.0 FIELD INVESTIGATION PHASE I <br /> 3. 1 Field Methods <br /> On June 15, 1990, WaterWork personnel advanced two angled <br /> soil borings (ASS-1, ASB-2) beneath the existing tank. The <br /> location and orientation of the borings are depicted on <br /> ' Figure 2. These borings were advanced at 45° from vertical <br /> and terminated beneath the longitudinal centerline of the <br /> tank approximately 5 feet beneath the tank bottom. Boring <br /> orientation, location, and length are shown on Figure 3. <br /> Drilling was conducted by Spectrum Exploration, Inc. (C57- <br /> 51-2289 ) using a hollow stem auger drill rig . A field <br /> geologist continuously logged all drill cuttings and core <br /> samples for characterization of contamination and soil type <br /> using the Unified Soil Classification System. Descriptions <br /> ' of soils encountered and sample collection intervals are <br /> included on boring logs (Appendix II ) . Soil samples were <br /> collected from the borings at five foot intervals along the <br /> ' boring length, beginning at ten feet. Soil samples and <br /> drill cuttings were monitored for organic vapors by placing <br /> a small amount of representative material in a sealed <br /> container, then measuring the concentration of volatiles <br /> collected in the head space of the container with a <br /> photoionization detector (PID) calibrated to an isobutylene <br /> standard. The values obtained at each measurement point <br /> ' were recorded on the boring logs. Select soil samples were <br /> submitted to Sequoia Analytical ( DHS Cert . #145 ) for <br /> laboratory analysis. Analyzed sample intervals are noted on <br /> ' the boring logs. <br /> Samples were collected, and transported under chain-of- <br /> custody in accordance with WaterWork ' s Soil Sampling <br /> Protocol (Appendix III ) . The samples were analyzed for <br /> BTEX, TPHG, EDB and organic lead by appropriate EPA and DHS <br /> 3 <br />