Laserfiche WebLink
h <br /> J n <br /> A <br /> �~a <br /> TpE SITE SAFEry PLAN <br /> 4. PERSONAL YROTECTIVL' EQUIphtI:N i { ) <br /> to ccs far ii;e, site tasks and operations being conducted. <br /> Equipment used by e'np Y act resistance goggles, other Protective glove, etc.). <br /> Be Specific (i.e.,hard hat, imp <br /> Hard hat, protective gloves (,,hell liecessary), steel-toed boots <br /> 5 SITE CONTROL AND SECURITY MEASURES a implemented-. <br /> The following general work zone security guidelines should b P <br /> Work zone shall be barricad��enand <br /> drill itigoandtape <br /> sampl►g activities are not <br /> Excavations shall be closed <br /> r actually taking Place• Visitors will not enter the work <br /> No excavations shall be left unattend ro'ect safer; briefing. <br /> zone unless they have attended a project <br /> 6. DECONTAMINATION PROCEDURE <br /> the procedures and specific steps to be taken to decontaminate equipment <br /> List P <br /> and PPE. <br /> ui merit with t6sodiuin phosphate soltltloll and rinse with clean potable <br /> Nash eq p <br /> grater. <br /> 7. TRAINING REQUIREMENTS <br /> Prior to mobilization at the job site, employees vrill attend a safety bing riefing. <br /> e site, <br /> The briefing will include the nature of theoc direses anandlleme genccynP ocedures. <br /> protectioe, equipme�tt, decontamination Pr <br />