Laserfiche WebLink
• l+ <br /> i <br /> fatCITY OF STOCKTON <br /> DEPARTMENT OF MUNICIPAi, UTILITIES NOV 13 1992 <br /> 2500 NAVY DRIVE <br /> STOCKTON, CA 952O6-1 191 ENVIRONMENTAL HEALTH <br /> [209) S44-6750 <br /> F'�RMIT��F�i►lIGF� <br /> November 6, 1992 <br /> Henning Bros Drilling Co. , Inc. <br /> 3525 Pelandale Ave. <br /> Modesto, CA. 95356 <br /> Attn: Jim Holt <br /> Subject: Police Facility Emergency well <br /> The City of Stockton is preparing to formally destruct an existing <br /> well located at our police facility located at 22 East Market <br /> Street in Stockton. We request that you provide us with a written <br /> proposal to perform this work. <br /> The well is 8 inches in diameter, approximately 183 feet deep, and <br /> is located in an exterior basement immediately adjacent to the west <br /> wall of the Police Facility Building. The basement is covered by <br /> a galvanized steel grate, a portion of which must be unbolted, cut <br /> and removed to provide access over the well. An overhanging eve on <br /> the building may impose access problems for certain types of <br /> equipment. There is adjacent parking area available which should <br /> be sufficient to accommodate the necessary equipment required to <br /> perform the work. <br /> Mild steel casing extends from the basement floor to -157 feet and <br /> an open hole exists from this point to the bottom. At present, the <br /> well is open with a steel cap tack welded in place. A well video <br /> has been performed and shows no obstructions inside the well. The <br /> open hole portion appears to be relatively stable and no <br /> substantial cavities were apparent. <br /> Please provide a written cost proposal to destruct the well in <br /> conformance with the following requirements: <br /> 1. obtain a Well Abandonment Permit as required by the San <br /> Joaquin County Environmental Health Department. Copies of <br /> this permit shall be provided to the City prior to the start <br /> of work and posted on site during the project. All costs for <br /> the permit and associated inspection costs are to be included <br /> in the bid price. Likewise, all coordination for permit <br /> inspections shall be the responsibility of the Contractor. <br /> 2. Mobilize and demobilize all required equipment. <br /> "STOCKTON-CALIFORNIA'S SUNRISE SEAPORT" <br />